NIS2 and DORA — what exists, what is planned
NIS2 (Dir. 2022/2555) binds essential and important entities; DORA (Reg. 2022/2554) binds financial entities and, through their contracts, the ICT providers they rely on. Neither binds software, and no regulated operator runs BatleHub yet, so the project treats both as a future goal: this page lists what already serves their measures and what RFC 0036's last phase would add when the first regulated operator needs it.
Not yet a target the project meets
The rows under What phase 7 adds are not built. They are listed so that a regulated operator can see the gap before adopting BatleHub, and so the baseline (GDPR, ISO 27001, the CRA) does not have to be rebuilt to reach them. "Implemented" means the control exists in the code, at the place named in the Evidence column. See Compliance.
NIS2 — Art. 21(2) risk-management measures
| Measure | BatleHub control | Status | Evidence |
|---|---|---|---|
| (b) – Incident handling | Incident playbook; audit stream and Sigma rules for detection | Documented | Incident response, SIEM integration |
| (c) – Business continuity, backup | Backup and restore runbooks; stateless replicas | Documented | Disaster recovery, High availability |
| (d) – Supply-chain security | Scanning, SOC flags, verdicts and release-age gates on every proxied artifact; an exposure report of who pulled a flagged version | Implemented | Scan worker, batlehub-cli exposure list |
| (e) – Vulnerability handling and disclosure | The project's private reporting, targets and advisories | Documented | SECURITY.md, CRA mapping |
| (h) – Cryptography | Ed25519 signatures on publishes and on the audit seal chain | Implemented | crates/core/src/services/signature.rs, [audit] seal_signing_key |
| (i) – Access control | Grants and verbs; every authentication event audited | Implemented | Access control, ISO 27001 mapping |
| (j) – Multi-factor authentication | Enforced at your IdP; BatleHub does not check it | Manual process | phase 7 below |
NIS2 — Art. 23 reporting
Art. 23 asks an entity for an early warning within 24 hours of becoming aware of a significant incident, a notification within 72 hours and a final report within one month. The reporting is the operator's; what BatleHub supplies is the evidence the reports are written from.
| Obligation | BatleHub control | Status | Evidence |
|---|---|---|---|
| Becoming aware | Sigma rules over the audit stream; Prometheus alerts | Implemented | deploy/siem/sigma/, deploy/prometheus-alerts.yaml |
| The facts of the incident | Audit log for the window, exported | Implemented | batlehub-cli audit export --from <start> --to <end> |
| The facts were not altered | The seal chain verifies for the window, and its head matches the SIEM's copy | Implemented | batlehub-cli audit verify --from <start> --to <end> --head <digest> |
| The reports themselves | 24 h / 72 h / one month | Manual process | Incident response § NIS2 Art. 23 |
DORA — Art. 9–12, 18, 30
| Article | BatleHub control | Status | Evidence |
|---|---|---|---|
| 9 – Protection and prevention | Access control, IP blocking, rate limiting, hashed tokens | Implemented | Production hardening |
| 10 – Detection | Audit stream, Sigma rules, Prometheus alerts | Implemented | SIEM integration |
| 11 – Response and recovery | Incident playbook | Documented | Incident response |
| 12 – Backup and restoration | Backup and restore runbooks | Documented | Disaster recovery |
| 12 – Restoration tested, with an RPO/RTO | — | Not built | phase 7 below |
| 18 – Incident classification | — | Not built | phase 7 below |
| 30 – Contractual terms with an ICT provider | — | Not built | phase 7 below |
What phase 7 adds — not yet built
RFC 0036 §12 names these, to be built when a regulated operator needs them. None exists today.
| Addition | Serves | What it would be |
|---|---|---|
| MFA enforcement | NIS2 21(2)(j), DORA 9 | A provider setting that refuses a sign-in whose OIDC acr / amr claims do not show a second factor |
| KMS-held signing keys | NIS2 21(2)(h), DORA 9 | The publish, APK, VS Code and seal signing keys held in a KMS, with a written rotation procedure |
| Restore test in CI | DORA 12 | A scheduled restore of a backup into a fresh instance, with a stated RPO and RTO it is measured against |
| Incident classification | DORA 18, NIS2 23 | Classification fields (severity, affected services, data impact) on notifications |
| Art. 30 contract annex | DORA 30 | A template annex for a hosted offer: service levels, audit and access rights, exit, sub-contracting |
Until then, a regulated operator covers these with its own controls: MFA at the IdP, keys in its own secret store, its own restore drills and its own classification in the ticket.